Go
New
Find
Notify
Tools
Reply
  
Msd grid sle
 Login/Join
 
DRR Trophy
posted
  

I have mega 475 delay box and I use the spool function or stage 5 as the starting line enhancer.
Intermittently it will not go on the step 5 and go to launch rpm even tho the delay box is set correctly. I have tried two different delay boxes.
Is this a software issue?
 
Posts: 68 | Location: chicago | Registered: July 28, 2013Reply With QuoteReport This Post
DRR Sportsman
posted Hide Post
Doesn't the mega box provide ground and not power might need to check wiring for the Grid?
 
Posts: 598 | Location: Vinita, OK | Registered: April 29, 2003Reply With QuoteReport This Post
DRR S/Pro
Picture of Lenny5160
posted Hide Post
quote:
Originally posted by Blake4128:
Doesn't the mega box provide ground and not power might need to check wiring for the Grid?


The 475 outputs are all +12 volts.

The PB inputs are all Ground except for the Line Lock PB which is +12 volts.


Tony Leonard
 
Posts: 5838 | Location: Inver Grove Heights, MN | Registered: March 18, 2004Reply With QuoteReport This Post
DRR S/Pro
posted Hide Post
In Grid, IGNITION TIMING STEP RETARD 5 tab, what is the Engine RPM programed to?
 
Posts: 5485 | Location: 53056 | Registered: December 30, 2009Reply With QuoteReport This Post
  Powered by Social Strata  
 


© DragRaceResults.com 2026