|
Go | New | Find | Notify | Tools | Reply |
DRR Pro |
I have to cruise around lower Atlanta to do a few pickups. Some one told me that the roads were all under construction? How bad is the Villa Rica area, and Mcdonough ? Thanks if you can help.This message has been edited. Last edited by: Footloose, | ||
|
DRR S/Pro |
The most construction is on I285 on the east side. Other than that just the normal Atlanta grid lock...…………………. 272" Spitzer 540 Chevy The Blower Shop XR1 FTI XPM Series Converter FTI Level 6 Powerglide 3.69@199 .916 60' 2017 Bradenton Heads Up Madness Open Outlaw Champ 2018 PDRA T/D #5 2019 PDRA T/D #2 2020 Retired From T/D Competition.... 2020 Bradenton NMCA Hemi Shootout Winner 2021 getting back into bracket racing with a Gen3 Hemi powered 87 Cutlass. | |||
|
DRR Pro |
Traffic always sucks on I-75 near McDonough, with or without construction. Mike | |||
|
DRR Pro |
So Summit area is backed up alot. So Mike your telling me to just get stuff shipped. I get it in 1 day. No hurry | |||
|
DRR Pro |
ABSOLUTELY Mike | |||
|
DRR Sportsman |
There is still quite a bit of construction around, although, I havent been out Villa Rica way in several years, I know it had a growth explosion. South side, ah well, its never finished, too many people making retirements off ATL roadways. Summit is a 75 minute ride fo me. Its not too terribly bad, compared to other areas. You have to put in the effort, to get anything out of it. | |||
|
DRR S/Pro |
I went by Villa Rica a month ago, there was no construction...…. 272" Spitzer 540 Chevy The Blower Shop XR1 FTI XPM Series Converter FTI Level 6 Powerglide 3.69@199 .916 60' 2017 Bradenton Heads Up Madness Open Outlaw Champ 2018 PDRA T/D #5 2019 PDRA T/D #2 2020 Retired From T/D Competition.... 2020 Bradenton NMCA Hemi Shootout Winner 2021 getting back into bracket racing with a Gen3 Hemi powered 87 Cutlass. | |||
|
Powered by Social Strata |
Please Wait. Your request is being processed... |